DC Hub — Data Center Energy, Electricity & Power Grid Data: Site Selection, Colocation, Gas, Fiber

by dchub.cloud · cloud.dchub/mcp-server

Data center energy, electricity & power grid data: DCPI to query and cite, capacity to buy or lease.

OnlineRemote + local
Category
Cloud and DevOps
Connection
Remote (HTTP)
Tools
60 reported
Status
Online

Connect it to your AI

Claude Code

claude mcp add --transport http mcp-server https://dchub.cloud/mcp/registry

Claude, ChatGPT, Cursor and other apps

Add it as a custom connector with this URL (Streamable HTTP):

https://dchub.cloud/mcp/registry

Or run it locally (npm)

claude mcp add mcp-server -- npx -y dchub-mcp-server@2.12.44

Cursor, VS Code and other apps (mcp.json)

{
  "mcpServers": {
    "mcp-server": {
      "url": "https://dchub.cloud/mcp/registry"
    }
  }
}

Tools it offers

60 tools, as the server itself reported during our check on Oct 31, 2026.

  • execute_planUse this when a data center question spans several topics: one-call planner over megawatts and power density, grid headroom and power availability, interconnection queues, substations and transmission, site selection and
  • claim_free_keyUse this when the user wants more DC Hub data center data than keyless allows, or asks for a key; no key is needed to start. Mints a free key and returns it plus connect_url, a connector URL with the key embedded (the on
  • searchUse this when a Deep Research or ChatGPT-connector client needs a data center facility search (search/fetch format). Returns a list of matching data-center facilities as {id, title, url}; pass an id to the `fetch` tool f
  • fetchUse this when you have an id from `search` and need that data center facility record (search/fetch format). Returns {id, title, text, url, metadata} — a citable public summary of one data-center facility (name, operator,
  • search_facilitiesUse this when the user asks which data centers exist, or who operates in a city, state or country; filters: country, state, city, operator, MW range, tier or text. Returns name, operator, location, market, status and MW
  • get_facilityUse this when the user asks about one data center facility: name, operator, address, lat/lon, power capacity (MW total/used), cooling type, fiber providers (count + carrier list), commissioning year, status, the DCPI ver
  • get_market_intelUse this when the user asks about a data-center market (metro supply, operators, pipeline, pricing): facility count, tracked MW, status mix, top providers, recent facilities or lease pricing. Pass market as a slug (e.g.
  • get_market_dcpi_rankUse this when the user asks where a data center can get grid power, how fast, or whether a market is a BUILD, CAUTION or AVOID (e.g. "Where can a 100 MW data center get power fastest?"): DCPI scores 300+ markets daily on
  • predict_market_trajectoryUse this when the user asks where a data center market's power outlook is heading (next 1-8 quarters). Projects excess_power_score and constraint_score forward with confidence bands that WIDEN with horizon, from DC Hub's
  • get_gas_indexUse this when the user asks which US states suit gas-fired data center power: the Data Center Gas Index (DCGI), a per-state score. ★ DO NOT COMPARE a DCGI figure published before 2026-08-08 with one published now — they
  • get_gas_economicsUse this when the user asks what behind-the-meter gas power costs in a US data-center market: Henry Hub spot, regional basis differential, and the delivered industrial + electric gas tariff ($/MMBtu), each with its own s
  • get_grid_scoreboardUse this when the user asks how power grids compare: demand, fuel mix or renewable share. GLOBAL grid scoreboard — 9 US grid operators (the 7 US ISOs PJM, ERCOT, CAISO, MISO, SPP, NYISO, ISO-NE, plus BPA and TVA) + Great
  • compare_isosUse this when the user asks to compare two to four power grids side by side — fuel mix, demand, renewable/gas share, and for the US ISOs interconnection-queue depth and time-to-power — in one call instead of N sequential
  • get_intelligence_indexUse this when the user asks how healthy a data center market is: composite score (0-100) aggregating supply/demand balance, vacancy, absorption velocity, fiber depth, power availability, and pricing trend. Returns the in
  • list_transactionsUse this when the user asks about data center M&A, acquisitions or capital deals — 1,800+ tracked deals (2019-present), each with its disclosed value where public (many private deals are undisclosed). Returns deal name,
  • get_newsUse this when the user asks for data center industry news or headlines (execute_plan also pulls news inside a broader market question). Curated data center industry news from 40+ trade sources (DCD, Data Center Knowledge
  • semantic_searchUse this when a data center or energy question is conceptual or fuzzy and keyword filters fall short — semantic (meaning-based) retrieval across DC Hub's industry news, M&A deals, the global facility map, per-market DCPI
  • search_intelligenceUse this when you need meaning-based search over DC Hub's data center intelligence corpus, choosing corpora — industry news, M&A deals, discovered facilities, per-market DCPI narratives, press releases, announcements, pe
  • get_market_contextUse this when you need a whole data center market briefing for your context window — one call returns a token-budgeted context pack for a data-center market: DCPI verdict, power & grid facts, the Claude-written 12-month
  • get_iso_contextUse this when you need a whole power grid (ISO) briefing for your context window — one call returns a token-budgeted context pack for a US ISO/RTO: live grid snapshot (demand, fuel-mix shares), DCPI verdict mix & grid ec
  • get_pipelineUse this when the user asks what data centers are being built, announced or permitted in a market or by an operator. Example: "What data centers are under construction in Northern Virginia and when do they come online?"
  • get_power_pipelineUse this when the user asks where new power generation is coming online (the forward supply pipeline) — e.g. "how much new generation is planned in Virginia / the Southeast / ERCOT, and when?". Planned, permitting, and u
  • get_infra_projectsUse this when the user asks what gas pipeline or transmission line projects are planned, proposed, approved or under construction — the forward build-out, not the existing network. e.g. "which interstate gas pipelines ar
  • get_power_availability_timelineUse this when the user asks when power will be available, or about time-to-power, in a US state: year by year. Composes: new generation coming online from EIA-860M monthly, split by confidence class (under-construction v
  • get_global_powerUse this when the user asks about power plants worldwide or in a non-US country — operating AND the forward pipeline (announced / pre-construction / under-construction), across ALL fuels (coal, oil/gas, nuclear, solar, w
  • get_interconnection_queueUse this when the user asks about grid interconnection queues: how congested an ISO's queue is or how much data-center load is waiting. Returns queued generation GW per ISO. The projects field changes shape: with iso= it
  • get_refined_queueUse this when you need interconnection queue projects filtered server-side. Instead of pulling the raw queue into context to filter (token-expensive, error-prone), push the predicates to the data layer and get back ONLY
  • get_retirement_headroomUse this when the user asks where retiring power plants free grid capacity: scans EIA-860M retirements to find near-term transmission grid headroom — a retiring plant is a CONCRETE headroom event (its POI frees injection
  • get_hosting_capacityUse this when the user asks how many MW a distribution feeder can take: utility-published hosting capacity — the MW a NAMED distribution feeder can actually take, straight from the utility's own hosting-capacity GIS. Pub
  • analyze_parcelUse this when the user has a land parcel for a data center site: structured read of its boundary — pass your own GeoJSON Polygon/MultiPolygon, OR just lat+lon and DC Hub finds the containing parcel in its HOSTED parcel-b
  • rank_sitesUse this when you have enriched candidate data center sites to rank under constraints — the normalization contract that lets you compare sites across separate analyze_site calls WITHOUT dropping into code. Pass candidate
  • discover_toolsUse this when you are unsure which DC Hub data center, power or grid tool fits: lists tools by family. Returns _entity=tool_families — a front_door block (execute_plan for any multi-capability question, get_changes to re
  • plan_queryUse this when you want to see the plan for a data center question without running it (execute_plan runs the same planner and returns the answers). Reach for plan_query only to review, log, diff or audit a plan before exe
  • save_to_shortlistUse this when the user wants to keep a data center site on a named shortlist that survives across conversations (Phase 5 statefulness). Snapshots the site's objectives + its current percentile objective_score, so you can
  • get_shortlistUse this when the user wants to see a saved data center site shortlist. With refresh=true (default) each site is RE-SCORED against the current national percentile baseline and returns saved_score, current_score, and scor
  • set_shortlist_alertUse this when the user wants a drift alert on a saved site shortlist so you can stop polling and be notified when a site's national standing moves materially (Phase 5). Fires when any site in the shortlist has current pe
  • suggest_reallocationUse this when a saved data center site drifts (its national standing dropped — surfaced by get_shortlist refresh or a set_shortlist_alert firing), get replacement candidates from the rest of that shortlist so the alert b
  • get_grid_dataUse this when the user asks for live electricity grid data (power demand, fuel mix) for one grid: the 7 US ISOs (PJM, ERCOT, CAISO, MISO, SPP, NYISO, ISO-NE), TVA, BPA, 40+ US utility balancing authorities (e.g. AZPS, SO
  • get_changesUse this when the user asks what changed in data center markets, facilities or deals since a date. Returns DCPI 7-day market movers, newly discovered facilities, new M&A deals + news — PLUS, for keyed callers with saved
  • get_facility_risk_deltaUse this when the user asks how a data center facility's (or its market's) power risk changed recently — "has this site gotten riskier lately?". Returns the REAL DCPI market-health delta (excess-power score change over t

Questions

What is the DC Hub — Data Center Energy, Electricity & Power Grid Data: Site Selection, Colocation, Gas, Fiber MCP server?

Data center energy, electricity & power grid data: DCPI to query and cite, capacity to buy or lease. It is made by dchub.cloud and listed in the official MCP Registry as cloud.dchub/mcp-server. MCP (Model Context Protocol) is the open standard that lets AI apps like Claude, ChatGPT and Cursor use outside tools.

How do I add DC Hub — Data Center Energy, Electricity & Power Grid Data: Site Selection, Colocation, Gas, Fiber to Claude?

In the Claude app or claude.ai, open Settings, then Connectors, choose "Add custom connector" and paste https://dchub.cloud/mcp/registry. In Claude Code, run: claude mcp add --transport http mcp-server https://dchub.cloud/mcp/registry

How do I add DC Hub — Data Center Energy, Electricity & Power Grid Data: Site Selection, Colocation, Gas, Fiber to ChatGPT?

ChatGPT can use remote MCP servers as connectors. In ChatGPT settings, under Apps and Connectors, turn on developer mode if asked, create a new connector and paste https://dchub.cloud/mcp/registry.

How do I add DC Hub — Data Center Energy, Electricity & Power Grid Data: Site Selection, Colocation, Gas, Fiber to Cursor?

Open Cursor settings, go to MCP, choose "Add new MCP server" (or edit ~/.cursor/mcp.json) and add: { "mcpServers": { "mcp-server": { "url": "https://dchub.cloud/mcp/registry" } } }

Does DC Hub — Data Center Energy, Electricity & Power Grid Data: Site Selection, Colocation, Gas, Fiber work right now?

Yes. It responded when we last checked on 31 Oct 2026. We check remote MCP servers every day.

What can DC Hub — Data Center Energy, Electricity & Power Grid Data: Site Selection, Colocation, Gas, Fiber do?

It gives your AI 60 tools, including execute_plan, claim_free_key, search, fetch, search_facilities. The full list is on this page.

Is this your server? Get the badge for your README
chen.media/mcp badge

Markdown (GitHub README)

[![Listed on chen.media/mcp](https://chen.media/mcp/badge/cloud-dchub-mcp-server.svg)](https://chen.media/mcp/cloud-dchub-mcp-server)

HTML (switches to dark mode on its own)

<a href="https://chen.media/mcp/cloud-dchub-mcp-server"><picture><source media="(prefers-color-scheme: dark)" srcset="https://chen.media/mcp/badge/cloud-dchub-mcp-server.svg?theme=dark"><img src="https://chen.media/mcp/badge/cloud-dchub-mcp-server.svg" alt="Listed on chen.media/mcp" height="40"></picture></a>

More in Cloud and DevOps

See all